Was this page helpful?

2010-10
2010-10Edit

 

vendredi 01/10/2010

- OBSERVATION OF TEST EBPG LITHO

After vistec "rabbit ear" pbm solved, testing several fracturation modes and current

Rq: resist=40g/L spinned at 5krpm (5krpm/s) for 60s, dvpt 30" in mibk + 10" ipa

Rq: height ~ 30microns, flat at ~ 2+-1micron/mm

Rq: dose multiplier for QPCs=1.5

Y=1: old fracturation

Y=1,1:

old problems seen week 16/9 now unseen

pbm (vertical shifts) on some QPC arrows in bottom

QPC opening (top, center)=212nm

Y=1_bottom_contact.jpg

Y=1_bottom_gate.jpg

Y=1_top_centerQPC.jpg

Y=1_top_contact.jpg

10-01_Y=1_top_gate.jpg

 

Y=1,2: problem of arrow shift has disappeared => beam stabilisation issue (or charging effect) => set waiting time of 30"

Y=1,2_bottom_gate.jpg

 

Y=2: sweep X + optimize writing speed

no issues, QPC opening (top, center)=212nm

images taken on Y=2,1:

 

Y=4: I large=10nA (instead of 100nA)

no visible difference

mercredi 06/10/2010

Test fuite S818#1

Mesures entre 2 croix d'alignement de surface 20*20 µm2 distante de 200 µm : R=90 MΩ dans la lumière, R=133 MΩ sans lumière. Soit en comptant deux résistances en série vers le gaz d'aire 1500 µm2 une résitance de 1.5 1017 Ω/m2.

Was this page helpful?
Mots clés (Modifier les mots clés)
  • No tags

Fichiers 13

FichierTailleDateAttaché par 
10-01_Y=1,2_bottom_gate.jpg
Aucune description
49.51 Ko20:15, 1 Oct 2010AdminActions
10-01_Y=1_bottom_contact.jpg
Aucune description
283.47 Ko20:15, 1 Oct 2010AdminActions
10-01_Y=1_bottom_gate.jpg
Aucune description
267.49 Ko20:15, 1 Oct 2010AdminActions
10-01_Y=1_top_centerQPC.jpg
Aucune description
252.78 Ko20:16, 1 Oct 2010AdminActions
10-01_Y=1_top_contact.jpg
Aucune description
287.46 Ko20:16, 1 Oct 2010AdminActions
10-01_Y=1_top_gate.jpg
Aucune description
274.25 Ko20:16, 1 Oct 2010AdminActions
10-01_Y=2,1_bottom_contact.jpg
Aucune description
56.61 Ko20:16, 1 Oct 2010AdminActions
10-01_Y=2,1_bottom_gate.jpg
Aucune description
50.29 Ko20:16, 1 Oct 2010AdminActions
10-01_Y=2,1_top_contact.jpg
Aucune description
55.11 Ko20:16, 1 Oct 2010AdminActions
10-01_Y=2,1_top_gate.jpg
Aucune description
51.55 Ko20:16, 1 Oct 2010AdminActions
10-01_Y=2,1_top_QPC.jpg
Aucune description
41.03 Ko20:17, 1 Oct 2010AdminActions
 10-01_Y=4,1_bottom_contact.jpg
Aucune description
55.54 Ko10:38, 1 Oct 2010Frederic_PierreActions
 10-01_Y=4,1_top_contact.jpg
Aucune description
55.78 Ko10:38, 1 Oct 2010Frederic_PierreActions
Vous devez être connecté pour poster un commentaire.
Propulsé par MindTouch Core